Friday, April 13, 2018

Parking Lot and Driveway Work

After all the excavating work, 6 truckloads of shale were spread out and then covered with 4 truckloads (about 86 tons) of gravel.   After all this was done, a heavy roller pressed everything into place - and voilà - we have a driveway!





No comments:

Post a Comment