While Tina was in Boston for a few days, Lars and Jeff made huge progress with laying drain tiles near the lower pond, where the overflow turns into a small stream. We had already installed a "running" bridge, so we could walk - and run - around the pond, but there was no way to take the four-wheeler or even the tractor from one field to the next.
They cleaned out the small stream bed and made space for 2 sections of drainage tile. Each section is about 18 inches in diameter, and 8 ft long. After they placed the tiles, Jeff used the tractor and back-filled against them, making a path across. It is certainly very efficient and a lot cleaner looking.
Sunday, May 12, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment