WHAT A DIFFERENCE ONE WEEK MAKES
And this is what it looked like this afternoon - just one week later:
Thanks Mike & Crew!
With the warmer temperatures, we were able to do the basic concrete work that is literally the foundation of fixing the exterior wall on the back of the upper barn. We needed to reinforce the section of the loading area, in front of the stone wall, so we can then install a new footer and frame in the barn doors.
On Saturday, we started mixing and pouring concrete - we all worked on this most of the day. Zach brought over his electric cement mixer, and while he mixed the concrete, Lars would use the wheelbarrow to take the mixed concrete and pour it into the form, where Jens would poke it down and use an air driven drill with a blunted tip to "vibrate" the concrete by pushing the running drill on the outside of the form. We used 70 bags of concrete on Saturday, and as we got near the end, one side of the form gave out under all the pressure - we lost about half our work :(An idyllic farm at the foot of North Mountain, just north of Carlisle, PA where we have been growing grapes, berries and other fruits for the past ten years. We are happy to announce that we finally opened our winery, The Winery at the Long Shot Farm, in March of 2019.